rssFollow us on Facebook

Markets Served

About Triumph President's Message Community Involvement News Safety and Health
Why Triumph Available Positions
Engineering Procurement Project Management Project/Cost Controls Construction Management Drafting & Design
SAGD Upgrading Pipelines Infrastructure O&G Development Carbon Capture Water/Waste Treatment Drafting & Design
Heavy Oil Conventional Oil Natural Gas Water/Waste

Projects Involving Multiple Disciplines

Trim Firewater Protection

  • Design and construction management of a firewater protection system for a major tank farm facility.

Diluent Pipeline and Facilities

  • Complete EPCM for a 50 km 16 inch diluent pipeline with pumping facilities.

Edmonton Oil/Diluent Terminal Tie-In

  • Detailed design, procurement and construction of the piping and pipe rack system to tie in a 24 inch pipeline to a tankage facilities.

Gasification Study

  • A study on the use of synthetic gas in boilers.

Single Well Battery and Well Tie-Ins

  • Single well batteries and tie-ins for Caroline and Garrington

ConocoPhillips – Mechanical Assistance

  • Provided in-house mechanical assistance for projects and MOC support.

Conoco Phillips – Brazeau Compressor

  • EPCM services for the Brazeau compressor install.

Steam Assisted Vacuum Filter Press

  • Engineering services and technical support for the design and fabrication of a steam assisted vacuum filter press for importation and installation in Canada.

Ethanol Plant CO2 Capture Plant

  • Complete EPCM for a 250 MTPD CO2 capture plant.  The process takes CO2 from an ethanol plant and compresses, dehydrates, liquefies and stores it for truck transportation.

Christina Lake Upgrader Demonstration Plant DBM

  • A 300 BPD Upgrader demonstration plant field installation designed for integration into the Christina Lake SAGD facility to reduce diluents requirements.

DRU Pilot Plant

  • Complete EPCM for a 5 BPD pilot plant designed for diluents recovery of bitumen that is presently in operation for testing of Christina Lake SAGD bitumen.

SDA Pilot Plant

  • Presently completing EPCM for a 5 BPD pilot plant design for integration with the DRU pilot and solvent deasphalting of bitumen to meet heavy oil pipeline spec requirement.

Surmont SAGD Facility Process Design Basis

  • A 50,000 BPD Bitumen plant near Christina Lake.  Completion of FEED work for plant and well pads.

Redwater Cavern Storage Study

  • A feasibility study on salt cavern storage in the Redwater area.

Railcar Offloading Facility

  • Complete EPCM for a double sided rack railcar offloading facility capable of offloading of 15,000 BPD of condensate.

Commercial Upgrader Study

  • A study to evaluate technically and economically various process configuration options for a bitumen upgrader.

Winefred River plant revitalization

  • Complete EPCM for installation of a compressor

 

La Glace Full Service Terminal

  • Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility.  Processes include gravity and mechanical separation.

Fox Creek Full Service Terminal

  • Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility.  Processes include gravity and mechanical separation.

Drayton Valley Full Service Terminal

  • Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility.  Processes include gravity and mechanical separation.

Dawson Creek Full Service Terminal

  • Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility.  Processes include gravity and mechanical separation.

Compressor Installation

  • Complete EPCM for the installation of a compressor

C2+ Pipeline Transport Feasibility Study

  • Development of a FEED study and DBM to construct a 400 km 16 inch C2+ pipeline and associated facilities.

C3+ Pipeline and LACT

  • EPCM of a pipeline and pumping facility.

By Projects Involving Discipline Specific Support

Civil/Structural

  • Building drawing code review
    • Review of building drawings ensuring they were to code.
  • MCC Structural Steel
    • Structural steel design for a motor control center
  • 3rd Party Shippers Piperack
    • Design of a piperack for 5 large diameter pipelines entering a pipeline terminal facility.

Process

  • Amine Unit Modifications
    • Amine unit modifications for enhanced sulphur recovery.
  • Process Support for upgrading/SAGD FEED and DBM studies
  • Operations Process Engineering Assistance
    • Provided diluents and glycol system and plant debottlenecking assistance.
  • Redwater Flare modeling
    • A flare study for a new proposed flare.
  • C2 Recovery
    • C2 plant recovery DBM
  • Sulphur Plant
    • Sulphur plant debottlenecking

Pipeline

  • Pipeline studies
    • Review and proposal of routing and sizing for diluents/dilbit pipelines from surround areas to a regional facility.

Mechanical

  • Multiple incinerator design projects
  • Mechanical support for troubleshooting high vibrations on a skid.

EI&C

  • Fire Alarm Electrical Design

Regulatory

  • BioDiesel Facility
    • Secured land use authorization from the county, preliminary discussions with CN Rail and preliminary development plan work.

Drafting & Design

  • Drafting Assistance for As Builts and P&ID Updates
  • General Drawing Updates
  • Drawing control system setup and management