Projects Involving Multiple Disciplines
Trim Firewater Protection
- Design and construction management of a firewater protection system for a major tank farm facility.
Diluent Pipeline and Facilities
- Complete EPCM for a 50 km 16 inch diluent pipeline with pumping facilities.
Edmonton Oil/Diluent Terminal Tie-In
- Detailed design, procurement and construction of the piping and pipe rack system to tie in a 24 inch pipeline to a tankage facilities.
Gasification Study
- A study on the use of synthetic gas in boilers.
Single Well Battery and Well Tie-Ins
- Single well batteries and tie-ins for Caroline and Garrington
ConocoPhillips – Mechanical Assistance
- Provided in-house mechanical assistance for projects and MOC support.
Conoco Phillips – Brazeau Compressor
- EPCM services for the Brazeau compressor install.
Steam Assisted Vacuum Filter Press
- Engineering services and technical support for the design and fabrication of a steam assisted vacuum filter press for importation and installation in Canada.
Ethanol Plant CO2 Capture Plant
- Complete EPCM for a 250 MTPD CO2 capture plant. The process takes CO2 from an ethanol plant and compresses, dehydrates, liquefies and stores it for truck transportation.
Christina Lake Upgrader Demonstration Plant DBM
- A 300 BPD Upgrader demonstration plant field installation designed for integration into the Christina Lake SAGD facility to reduce diluents requirements.
DRU Pilot Plant
- Complete EPCM for a 5 BPD pilot plant designed for diluents recovery of bitumen that is presently in operation for testing of Christina Lake SAGD bitumen.
SDA Pilot Plant
- Presently completing EPCM for a 5 BPD pilot plant design for integration with the DRU pilot and solvent deasphalting of bitumen to meet heavy oil pipeline spec requirement.
Surmont SAGD Facility Process Design Basis
- A 50,000 BPD Bitumen plant near Christina Lake. Completion of FEED work for plant and well pads.
Redwater Cavern Storage Study
- A feasibility study on salt cavern storage in the Redwater area.
Railcar Offloading Facility
- Complete EPCM for a double sided rack railcar offloading facility capable of offloading of 15,000 BPD of condensate.
Commercial Upgrader Study
- A study to evaluate technically and economically various process configuration options for a bitumen upgrader.
Winefred River plant revitalization
- Complete EPCM for installation of a compressor
La Glace Full Service Terminal
- Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility. Processes include gravity and mechanical separation.
Fox Creek Full Service Terminal
- Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility. Processes include gravity and mechanical separation.
Drayton Valley Full Service Terminal
- Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility. Processes include gravity and mechanical separation.
Dawson Creek Full Service Terminal
- Complete engineering and procurement of 2500 m3/day custom Oil Treatment facility with a 1,500 m3/day water treatment facility. Processes include gravity and mechanical separation.
Compressor Installation
- Complete EPCM for the installation of a compressor
C2+ Pipeline Transport Feasibility Study
- Development of a FEED study and DBM to construct a 400 km 16 inch C2+ pipeline and associated facilities.
C3+ Pipeline and LACT
- EPCM of a pipeline and pumping facility.
By Projects Involving Discipline Specific Support
Civil/Structural
- Building drawing code review
- Review of building drawings ensuring they were to code.
- MCC Structural Steel
- Structural steel design for a motor control center
- 3rd Party Shippers Piperack
- Design of a piperack for 5 large diameter pipelines entering a pipeline terminal facility.
Process
- Amine Unit Modifications
- Amine unit modifications for enhanced sulphur recovery.
- Process Support for upgrading/SAGD FEED and DBM studies
- Operations Process Engineering Assistance
- Provided diluents and glycol system and plant debottlenecking assistance.
- Redwater Flare modeling
- A flare study for a new proposed flare.
- C2 Recovery
- C2 plant recovery DBM
- Sulphur Plant
- Sulphur plant debottlenecking
Pipeline
- Pipeline studies
- Review and proposal of routing and sizing for diluents/dilbit pipelines from surround areas to a regional facility.
Mechanical
- Multiple incinerator design projects
- Mechanical support for troubleshooting high vibrations on a skid.
EI&C
- Fire Alarm Electrical Design
Regulatory
- BioDiesel Facility
- Secured land use authorization from the county, preliminary discussions with CN Rail and preliminary development plan work.
Drafting & Design
- Drafting Assistance for As Builts and P&ID Updates
- General Drawing Updates
- Drawing control system setup and management