SAGD

SAGD – Project Examples

  • SAGD Operations Support
    • Provide operations support including cost controls for a SAGD facility ensuring vendors are following procedures and using correct billing practices.
  • Surmont SAGD Facility Process Design Basis
    • A 50,000 BPD Bitumen plant near Christina Lake.  Completion of FEED work for plant and well pads.
  • May River SAGD Facility Process Design Basis
    • A 10,000 BPD Bitumen plant near Christina Lake.  Completion of FEED work for plant and well pads.
  • Christina Lake Phase 3A
    • A location study for the central plant and associated well pads for 50,000 BPD production.
  • Christina Lake Upgrader Demonstration Plant DBM
    • A 300 BPD Upgrader demonstration plant field installation designed for integration into the Christina Lake SAGD facility to reduce diluents requirements.
  • DRU Pilot Plant
    • Complete EPCM for a 5 BPD pilot plant designed for diluents recovery of bitumen that is presently in operation for testing of Christina Lake SAGD bitumen.
  • SDA Pilot Plant
    • Presently completing EPCM for a 5 BPD pilot plant design for integration with the DRU pilot and solvent deasphalting of bitumen to meet heavy oil pipeline spec requirement.